1 Cost Per Minute or better understood as Cost Per Standard Minute, is calculated by taking a factory?s overhead expenses and labor costs (excluding material costs) for a particular period, divided by the standard minutes produced during the same period. 2 Total overhead cost (including the labour cost of running a manufacturing facility over a particular period of time), divided by the standard minutes produced during that time period.

Importing valuable goods from Asia: Sea, Air, Rail, or Barge?
Sea, air, rail, or barge? Discover the pros and cons of each transport modality and confidently choose the best option for your valuable cargo.

