SMV (Standard Minute Value) is the time in minutes that it takes a worker to complete a specific operation or to produce a specific garment. It should cover the time taken to perform the operation at a normal or standard pace, plus an allowance for relaxation and possible stoppages. It is also called Standard Allowed Minutes (SAM), or if computed in hours, it is known as Standard Allowed Hours (SAH).

Importing valuable goods from Asia: Sea, Air, Rail, or Barge?
Sea, air, rail, or barge? Discover the pros and cons of each transport modality and confidently choose the best option for your valuable cargo.

